Plant specification
Newell WTP
Newell Regional Services Corp. (NRSC) · Brooks, AB, Canada
Status not reported
Pall/Aria Microza microfiltration (MF)
Source: Lake Newell Reservoir
OEM: Pall (now AriaFiltra)
OEM: Kinetico
Line items
7
Covered by DWG *
0
Coverage gaps *
2
Cost to close gaps *
$1,860
System
Clean-in-Place & Chemical
Priority
All priorities
| Part # | Description | Priority | Rec. | On site* | DWG spare* | Coverage* | |
|---|---|---|---|---|---|---|---|
| Basket/screen for YS23S30-040 Spears / 316 SS | Replacement #30 mesh 316 stainless screen/basket for 4 in Y-strainer CIP · CIP pump discharge | Critical | 1 | 2 | 1 | Covered on site | |
| 13469 Wilden P.025 | Air-operated diaphragm pump, 0–5 GPM CIP · Chemical / utility | High | 1 | 0 | — | Not covered | |
| WH034199 Watlow / titanium immersion heater | 45 kW, 8 in, 575 V, 3-phase titanium CIP heater CIP · CIP system | High | 0 | 0 | — | No target | |
| YS23S30-040 Spears | 4 in PVC Y-strainer, flanged; #30 mesh 316 SS screen; EPDM O-ring seal; 90 psi at 73 F; max 140 F CIP · CIP pump discharge | High | 0 | 0 | — | No target | |
| O-ring / body seal for YS23S30-040 Spears / EPDM as ordered in 2026 | Replacement body O-ring / seal for 4 in Y-strainer CIP · CIP pump discharge | High | 2 | 2 | — | Covered on site | |
| TBD Process-compatible pressure gauges / isolation hardware | Two pressure gauges, upstream and downstream of CIP strainer, for differential-pressure monitoring CIP · CIP pump discharge | High | 2 | 3 | — | Covered on site | |
| 27412 Spears | 3/4 in PVC strainer, 30 mesh, Viton CIP · Chemical / utility | Medium | 1 | 0 | — | Not covered | |
Showing 7 of 72 parts · * sample value