Plant Spec

Plant specification

Newell WTP

Newell Regional Services Corp. (NRSC) · Brooks, AB, Canada

Status not reported
Pall/Aria Microza microfiltration (MF)
Source: Lake Newell Reservoir
OEM: Pall (now AriaFiltra)
OEM: Kinetico
Membrane racks
4 × 100
400 UNA-620A modules, replaced Jun 2024
Installed membrane area
19,994 m²
215,200 ft²
Pall design capacity
32 MLD
Theoretical, 4 racks — not demonstrated
Observed rack output
4.3 MLD
Typical per rack, Rack 1, Apr 2026

Treatment train

Lake Newell Reservoir → distribution, in flow order

  1. 01

    Raw water intake

  2. 02

    Chemical pretreatment / enhanced coagulation

  3. 03

    Flocculation

  4. 04

    PAC (as required)

  5. 05

    Pall Microza microfiltration

  6. 06

    Downstream disinfection / storage / distribution

Pretreatment sequence unconfirmed
Original design basis: Enhanced coagulation, concrete flocculation basins, PAC adsorption, membrane filtration (2008 pilot recommendation). The 2022 fifth-train proposal describes it as “Limited - seasonal use of Powdered Activated Carbon”. Inconsistent with original design narrative; verify actual current pretreatment sequence against the plant P&ID before relying on either description.

Key findings

Conclusions recorded from the collected plant files

  1. 01

    Do not treat 32 MLD as Newell's demonstrated plant capacity - it is the theoretical membrane capacity implied by Pall's later 8-MLD/rack design basis; April 2026 data shows the plant operating materially below that flux

  2. 02

    Three distinct envelopes apply and should not be conflated: physical (4 racks/400 modules/~20,000 m2), Pall design (~32-40 MLD theoretical), and observed operating (4-6 MLD/rack, April 2026)

  3. 03

    Before using 32 or 40 MLD for an expansion, hydraulic guarantee, or capacity study: confirm ratings of common feed pumps, feed strainers, RF pumps/tank, compressed-air system, CIP system, clearwell hydraulics, and discharge piping - Pall did not review these when quoting the 40 MLD theoretical figure

  4. 04

    Verify the current chemical pretreatment sequence against the P&ID - the 2022 proposal's 'limited/seasonal PAC' description does not fully match the original enhanced-coagulation narrative

  5. 05

    Next logical analysis: build a Newell membrane performance curve (flux vs. TMP, permeability/TCF per filtration cycle, RF frequency, recovery, extrapolated rack capacity) using the April 2026 Rack 1 dataset, compared directly against the Pall design point

Installed systems

7 systems, grouped from the spare parts register

Basis: 2020 Pall annual inspection covers pump couplings and leakage; pump makes and models are not on file.

TagDescriptionMake / modelQtyNotes
—Feed / RF pumpsNot on file—Make and model not on file
V3203BFeed strainer limit switchNot on file—Low confidence — 2010 commissioning report only
View 2 spare parts →

Basis: Original Pall contract spares list (2009, WBS 1.00105); full module changeout June 2024.

TagDescriptionMake / modelQtyNotes
—MF membrane rackPall4100 modules each; HDPE piping, 8 in main connection
—MF membrane modulePall / Aria Microza
UNA-620A
400Highly crystalline PVDF, 538 ft² each; replaced Jun 2024
PIT-1021Filtrate pressure transmitterNot on file—Debris accumulation affecting integrity-test readings (2020)
—Rack turbidimeterHach
660 / SC200
—Referenced in 2017 expansion
—Particle counterHach
PCX 2200
—Referenced
View 22 spare parts →

Basis: Pall contract spares, 2014–2017 quotes, and 2023 positioner purchase. Installed population not fully traceable.

TagDescriptionMake / modelQtyNotes
—Lug / wafer butterfly valves, 1–8 inPall
222LT / 990
——
FCV10018 in flow control valve with positionerPall
222LT
——
—Electro-pneumatic valve positionerSMC
IP8101-032DH-DIJ00447
——
—Valve actuatorKeystone
79U-024
——
—4 in butterfly valve (non-Pall)Bray—Origin unconfirmed; issue reported May 2026
View 11 spare parts →

Basis: 2018 Numatics upgrade proposal: G2 electronics obsolete; G3 upgrade status unverified.

TagDescriptionMake / modelQtyNotes
—Solenoid / I/O valve manifoldsNumatics
G2 (DeviceNet)
—Count unreconciled: 7 vs 14 in 2018 proposal
—Air compressorAtlas Copco
GA30VSD+
28,123 h / 7,644 h run time (2020)
—Instrument air regulatorsNot on file—Changed from 1 in to 1/2 in per 2010 punch list
—Air-scrub flowmeterNot on file—Model not on file
View 5 spare parts →

Basis: 2015 heater quote (~10-week lead time) and 2026 CIP strainer failure and replacement order.

TagDescriptionMake / modelQtyNotes
—CIP tankNot on file—3,000 US gal (11.4 m³)
—Titanium immersion heater, 45 kW, 575 V, 3-phaseWatlow
WH034199
——
—4 in PVC Y-strainer, CIP pump dischargeSpears
YS23S30-040
—Replacement ordered 2026
—Air-operated diaphragm pump, 0–5 GPMWilden
P.025
——
View 7 spare parts →

Basis: 2010 redundancy modification (M1103). 2026 AriaFiltra controls refurbishment quoted; legacy purchases on hold.

TagDescriptionMake / modelQtyNotes
—Redundant PLC: 2 processors + redundancy moduleAllen-Bradley
ControlLogix
—Networks: ControlNet, DeviceNet
—HMI / SCADAPall—Pall HMI/SCADA interface
—Control panelsNot on file—Current electrical drawings not on file
View 13 spare parts →

Basis: 2009 shop drawing submittal, 2010 O&M manual, and 2019 service report.

TagDescriptionMake / modelQtyNotes
WS7709A / BSoftener systemKinetico
CP-216r OD
2—
—SmartStart controller, 120 VACKinetico
SmartStart
——
—Cation exchange resinNot on file—113 L per vessel (2009 submittal); current condition unknown
View 12 spare parts →

Site

Map
Location
Brooks, AB, CanadaStreet address not on file
Coordinates
Not on file
Owner
Newell Regional Services Corp. (NRSC)
Commissioned
2010
Equipment OEMs
Pall (now AriaFiltra), Kinetico

Contacts

No plant contacts in the source records.

Permits

No permits in the source records.